PUD 3 staff and commissioners discussed a draft 2027 budget paired with a draft 2028 budget at the Nov. 24 budget hearing. The drafts include proposed rate increases to keep up with rising equipment costs, increased power purchase rates, and continued work on critical infrastructure projects.
Staff presented a two-year budget and rate plan to help customers prepare and to smooth out the impacts. Rate increases will be applied to different customer types according to the cost of service for each type. The average rate increase for 2027 is 5.1% and for 2028 is 3.8%. Residential customers would see an overall increase of 5.5% in 2027 and 3.3% in 2028.

Following the biennial cost-of-service study, pole attachment fees have increased to $41 per attachment per year.
Both staff and commissioners shared concerns for customer cost impacts. As a not-for-profit utility, PUD 3 strives to keep rates as low as possible. To do that, some maintenance and repair projects have been delayed but highest priority projects have remained on the schedule. The draft budget also calls for transferring $4.1 million from reserves to lessen the rate impacts.
Customers have access to income-qualified bill assistance programs, and all customers can access budget billing or payment arrangements. The conservation department offers energy efficiency incentives, such as washer and dryer rebates and heating system upgrades, that can help with long-term bill savings.
The cost pressures leading to increased budgets are coming from multiple drivers. For example, PUD 3 staff shared the challenges in finding competitive prices for some specialized electrical equipment. In recent years, some items have doubled, tripled, or even increased in price by over 1,000%.
Bonneville Power Administration (BPA), from which PUD 3 purchases all its power, has announced several rate increases and surcharges in the coming years. The “Temporary BPA Power Adjustment” of $1.63 per month currently on customer bills is set to end after 2027.
While BPA has also faced the rising cost of supplies and equipment to maintain their systems, some of their increases are the result of lawsuits against BPA. This has lessened their ability to produce hydropower on the Columbia River system through additional “spill” operations, reducing revenue, which must be recovered through utility rates. Starting Jan. 1, 2027, BPA will require an additional temporary surcharge, which means PUD 3 customers will see a charge of $3.38 per month through 2028.
Commissioners anticipate voting on the proposed budget at their Dec. 8 regular meeting. A summary of the proposed budgets is posted at pud3.org.